Connection preparation
Foundation dimensions, water, drainage and power connections were checked against the drawings before shipment.
One PS-C2 outdoor module with a seated toilet was delivered for a public-sector project in Romania. It entered service in June 2026.

Project photographProject background
Before shipment, the team checked the exterior finish, interior, equipment and local-language labels. The PS-C2 was supplied as a complete module with a seated toilet.
The local team prepared the foundations and utilities, then lifted and connected the unit. It entered service in June 2026. A subsequent SOS reset issue was investigated with remote video support.
Installation record
Foundation dimensions, water, drainage and power connections were checked against the drawings before shipment.
PS-C2 was shipped as a complete module. The local team lifted it into place and connected the utilities.
The team helped investigate one SOS reset issue by video and retained a service record.
Project photographs
Photographs of the facilities, interiors and equipment.

Project photograph
Finished interior
Sanitaryware, lighting and controls inside the module.

Project photograph
Service bay
Water, drainage and equipment connections inside the service bay.

Project photograph
Outdoor placement
The installed module beside a path and planted area.
Project facts and original photographs are from the ESOO archive, reviewed on August 18, 2026. Displayed photographs have been retouched for brightness, colour and cleanliness; they are not evidence of dimensions or construction acceptance. Project records define the structure and configuration.
This case study records the model supplied at the time. The links below describe current products, not the exact specification delivered for this project.