Romania Delivery Project

One PS-C2 outdoor module with a seated toilet was delivered for a public-sector project in Romania. It entered service in June 2026.

Modules staged together for the Romania delivery projectProject photograph
Product model
PS‑C2
Project scale
1 seated module
In service
June 2026

Project background

Factory checks and local installation

Before shipment, the team checked the exterior finish, interior, equipment and local-language labels. The PS-C2 was supplied as a complete module with a seated toilet.

The local team prepared the foundations and utilities, then lifted and connected the unit. It entered service in June 2026. A subsequent SOS reset issue was investigated with remote video support.

Project type
Public-sector project
Site utilities
Water, drainage, sewer and power
Delivery method
Delivered complete; lifted and installed locally

Installation record

Installation and configuration

01

Connection preparation

Foundation dimensions, water, drainage and power connections were checked against the drawings before shipment.

02

Delivered complete

PS-C2 was shipped as a complete module. The local team lifted it into place and connected the utilities.

03

Remote support

The team helped investigate one SOS reset issue by video and retained a service record.

Project photographs

The site and equipment

Photographs of the facilities, interiors and equipment.

Finished interior of a standalone module in the Romania project

Project photograph

Finished interior

Sanitaryware, lighting and controls inside the module.

Pipework and maintenance access inside the Romania delivery module

Project photograph

Service bay

Water, drainage and equipment connections inside the service bay.

Romania project modules positioned in an outdoor setting

Project photograph

Outdoor placement

The installed module beside a path and planted area.

Project facts and original photographs are from the ESOO archive, reviewed on August 18, 2026. Displayed photographs have been retouched for brightness, colour and cleanliness; they are not evidence of dimensions or construction acceptance. Project records define the structure and configuration.

Products in the current range

This case study records the model supplied at the time. The links below describe current products, not the exact specification delivered for this project.

Project enquiries

The team can discuss product choices, installation and delivery for a similar new-build or retrofit project.

Project enquiry