Main content

Qinggangshu Public Restroom Station

The Qinggangshu project delivered two custom-enclosure outdoor restroom stations with PS-01-GD interiors in Sandaoyan, Pidu District, Chengdu.

Entrance and display at the Qinggangshu public restroom stationProject photograph
Configuration
Custom shell · PS‑01‑GD
Project scale
2 stations
In service
June 2025

Project background

Custom enclosures with fitted cubicles

The two Qinggangshu facilities use custom enclosures with PS-01-GD interiors. Entrances and information signs face the public path.

The project team prepared the foundations and utility connections before the complete units were transported and lifted into place. They entered service in June 2025. Project records show one staff member responsible for day-to-day operation of both facilities.

Project type
Park and tourism site
Site utilities
Water, drainage, sewer and power
Delivery method
Delivered complete and lifted into place

Installation record

Installation and configuration

01

Custom enclosures

The exteriors were designed for the park setting, with PS-01-GD integrated cubicles inside.

02

Delivered complete

Foundations and utilities were prepared before the units arrived for lifting and installation.

03

Daily operation

One staff member operates both facilities, as recorded for this particular project.

Project photographs

The site and equipment

Photographs of the facilities, interiors and equipment.

Full exterior of the Qinggangshu public restroom station in its surroundings

Project photograph

Station overview

Entrances and signs face the path beside the facilities.

Cubicle layout and shared area in the Qinggangshu project

Project photograph

Cubicle layout

Cubicle doors open from the main corridor.

Status control wall and wash area in the Qinggangshu project

Project photograph

Controls and display

Status display and controls in the shared area.

Interior rooms and wash area in the Qinggangshu project

Project photograph

Shared interior

Blue cubicle finishes alongside the wash area.

Project facts and original photographs are from the ESOO archive, reviewed on August 18, 2026. Displayed photographs have been retouched for brightness, colour and cleanliness; they are not evidence of dimensions or construction acceptance. Project records define the structure and configuration.

Products in the current range

This case study records the model supplied at the time. The links below describe current products, not the exact specification delivered for this project.

Project enquiries

The team can discuss product choices, installation and delivery for a similar new-build or retrofit project.

Project enquiry